
Kazakhstan
Calculation of relay protection and automation settings (RPA) for the 220/110/10 kV Makinsk substation
Professional calculation of RZiA settings for ORU-110 kV at the Makinsk substation.

Professional calculation of RZiA settings for ORU-110 kV at the Makinsk substation.

System Power Solutions LLP has completed the design of the reconstruction of the 10 kV power line for the Kenkiyak-Kumkol main oil pipeline in Kazakhstan.