List of Implemented Projects
Implemented projects by System Power Solutions LLP with consideration of projects by year
Development of Construction Management Plan section for the reconstruction project of the 10 kV overhead transmission line along the section 125.63-140.45 km of the Kenkiyak-Kumkol main oil pipeline
Design work for HVAC and water supply sections for the working project “Construction of Solar Power Plant in Saran City”
Development of project and estimate documentation for the project “Organization of communication channels with Avtozavod 110/10/10 kV Substation in Ust-Kamenogorsk, Asia Auto Kazakhstan JSC.
Design and integration works for Buran 220/110/10 kV Substation
Design and integration works for Buran 220/110/10 kV Substation
Calculation of Relay Protection and Automation system for Makinck 220/110/10 kV Substation
Development of emergency automation system
Development of temporary power supply scheme for 110 kV integrated gas-insulated switchgear at 310 MW combined steam and gas power plant, SEZ NINT, Karabatan Area
Expansion of 110 kV open-type switchgear with the introduction of 110 kV cells at Makinck 220 kV Substation.
Calculation of Relay Protection and Automation systems for 110 kV open-type switchgear at Makinck 220/100/10 kV Substation
Development of DED for “Strengthening the external power supply scheme for Turkestan City”. Construction of Ortalyk 220 kV Substation at the Working Project stage.
Design and construction and installation works
Engineering, design, and construction and installation works
Strengthening the external power supply scheme for Turkestan City. Construction of power grid facilities. Construction of Ortalyk 220 kV Substation.
Sections executed::
— Architectural solutions;
— WSS (Water Supply and Sewerage)
— EWSS (External Water Supply and Sewerage Networks)
— GT (General Layout and Transportation)
— HV (Heating and Ventilation)
— SVG
— Video surveillance and alarm system
— Calculations in LIRA (structural analysis software)
— Design and adaptation of roads
Sections executed::
Section: Architectural Solutions (AS); Heating and Ventilation (HV); General Layout; Water Supply and Sewerage (WSS); Estimate Section; Emergency Automation; SVG; External Water Supply and Sewerage Networks; Water Intake Structures; SCADA (Supervisory Control and Data Acquisition); Substations (SS); Electrical Supply (ES); Calculations for Buildings and Structures; Road Design Section; Foundation Calculations;
Complex development of design and estimate documentation consisting of:
— 110 kV overhead line of Akashi 110 kV substatio — 110 kV open-type switchgear of City step-down 500 kV substation
— Akashi 110/10 kV substation (General Layout, architectural and construction solutions, electrical solutions, relay protection and automation, cable management, assignments to the plant for auxiliaries board, direct-current board, low-voltage switchgear, integrated switchgear, packaged modular building)
— Dispatch and Technological Control Systems (DTCS)
— Automated System for Commercial Accounting of Electricity (ASCAE)
— Oil collector
— External water supply and sewerage
— Perimeter video surveillance system
— Firewater Reservoir
— Fire extinguishing pump station
Determination of the nearest point of connection of RES facilities to the power grids of the region under consideration according to the project study “Site Evaluation for RES Facilities Construction”
Author’s supervision services of the object “External power supply of the Southern deposits of Tortkuduk site No. 2” by Kazakhstan-French JV “KATCO” LLP.
“Development of pre-project documentation: “External power supply scheme” of Massivstroi-kz LLP
1. Technical decision on analyzing the reconstruction of 220 kV open-type switchgear of the 30 MW SES of Nomad Solar LLP
2. Reconstruction of 220/35 kV high voltage substation of Jalagash 30 MW SPP, Technical solutions on transposition of L-2019 220 kV overhead line.
Reference of completed projects
- “Construction of nodal distribution substation “Ridder” with rearrangement of 110 kV power transmission line”. Section: HVAC, Architectural solutions, fire alarm system, external and internal water supply and sewerage, air handling unit.
- Scheme of external power supply taking into account temporary connection of existing SEZ NINT 110/35/110 kV substation to 110 kV integrated gas-insulated switchgear at 310 MW combined steam and gas power plant in Atyrau region (Karabatan site).
- “Construction of “Data Center 150 MW” 220/110 kV Substation” - Section: EWSS, engineering design, GT.
- “Expansion of 220 kV open-type switchgear of Tsentralnaya substation” - Section: GT;
- Design and integration works for Buran 220/110/10 kV Substation - Section: Monitoring and control system and RPA, calculation of RPA settings;
- “Construction of 220 kV overhead line and the “GGMK” 220 kV substation” - Section: EWSS, HV and WSS;
- Calculation of Relay Protection and Automation system for Makinck 220/110/10 kV Substation;
- Karaganda Ferroalloy Plant (KFP) - Section: EWSS;
- Development of ED “Construction of Nura 110 kV distribution substation”;
- “Selection of site for construction of solar electric power plant with capacity of 20 MW”
- “Construction of main pipeline from “Kashagan” Complex Gas Treatment Plant to main pipeline “Makat-North Caucasus” - Section: GT, WSS, EWSS
- “Scheme of external power supply of mobile data center with capacity of 100 MW, in Turkestan region”;
- “Scheme of external power supply of mobile data center with capacity of 150 MW, in Almaty region”;
- “Scheme of external power supply of mobile data center with capacity of 180 MW, in Almaty region”;
- “Construction of Borei 35/110 kV substation with power transmission line 110 kV in Akmola region” - Section: WSS, EWSS, GT, HV, security video surveillance, lighting of the whole territory, access control system, video surveillance, sockets and switches, security alarm system, security lighting, automatic fire alarm system, structured cabling system, low-current system, SVG, calculations in LIRA, architectural solutions, estimate section;
- “Construction of Borei Energo 100 MW Wind Power Plant in Akmola region” - Section: Calculations in LIRA, estimated section, design and adaptation of roads;
- “Construction of Energo Trust 50 MW WPP in Akmola region” - Section: Calculations in LIRA, estimated section, design and adaptation of roads;
- “Construction of 50 MW WPP in Alakol district of Almaty region” - Section: Architectural Solutions (AS); Heating and Ventilation (HV); General Layout; Water Supply and Sewerage (WSS); Estimate Section; Emergency Automation; SVG; External Water Supply and Sewerage Networks; Water Intake Structures; SCADA (Supervisory Control and Data Acquisition); Substations (SS); Electrical Supply (ES); Calculations for Buildings and Structures; Road Design Section; Foundation Calculations;
- “Construction of wind power station with capacity of Sofievskaya Wind Power Plant LLP in Arshalyn district of Akmola region (WPP-3)” - Section: Calculation of Foundations, Estimate Section, Road Design Section, General Layout;
- “Scheme of external power supply” of Zapchast JSC;
- “Scheme of external power supply” of Vostokmashzavod JSC;
- “Scheme of external power supply” of Kazakhstal LLP;
- Development of DED for the project “Organization of communication channels with Avtozavod 110/10/10 kV Substation in Ust-Kamenogorsk, Asia Auto Kazakhstan JSC”;
- Development of power supply section for the object “Reservoirs RVZ-500 #16, 17 of Petropavlovsk Line Operation Dispatcher Station”;
- Development of emergency automation system “Complex Technology Line-1”;
Partners
Cooperation with market leaders is a guarantee of success of our projects.